One or more photo(s) has been virtually staged. Pre-Construction. To be built. Brand new Maronda Homes Lancaster A4 plan with estimated completion date of August 2024. CBS construction with full builder warranties. Terrific plan featuring large great room, loft area, bed / bath set up first floor, crown molding, solid surface tops in kitchen, extensive ceramic tile flooring, washer / dryer, blinds, 10x20 screened porch and much, much more.